Planning a flooring project in Richmond VA? Here is how long each type of flooring installation takes from start to finish.

One of the most practical questions Richmond homeowners ask before starting a flooring project is: how long will this take? The answer depends on the material, the size of the project, and how much preparation the subfloor requires.

LVP flooring is the fastest to install. A single bedroom or room (200–300 sq ft) can typically be completed in 4–6 hours including old floor removal. A full first floor of 1,000–1,500 sq ft usually takes 2–3 days. LVP can be walked on immediately after installation with no cure time required.

Hardwood flooring requires acclimation time before installation — typically 3–5 days in Richmond's climate to allow the wood to reach equilibrium with the home's humidity. After installation, nail-down hardwood can be walked on immediately, but site-finished floors require 24–48 hours between coats and are typically off-limits for 3–5 days total.

Tile installation takes longer due to mortar and grout cure times. A kitchen or bathroom tile floor typically takes 2–4 days for installation plus 24–48 hours before the grout can be walked on. Large-format tile in larger rooms can take 4–7 days due to the careful setting required to ensure flatness.

Old floor removal adds 1–4 hours per room depending on the material being removed. Staple-down carpet is faster to remove than glued vinyl or ceramic tile. PA Painting handles old floor removal and disposal as part of all flooring installation projects in Richmond, Henrico, and Chesterfield.